SUMO Construction & Engineering Pvt. Ltd.

SUMO Construction & Engineering (P) Ltd established in the year 2009, is a complete Infrastructure Solutions Provider, executing structures such as Tunnels, major and minor Bridges, Hydropower projects, Roads, Housing Colonies, and Industrial Buildings and Constructions with our experience in huge executions even in the remotest of locations of Nepal featuring extremely challenging climatic conditions, we have mastered the art of dealing With complex geological conditions of the Himalayan terrain. SUMO is capable to provide turnkey E.P.C. solutions across multiple business sectors like Energy, Highways, and Urban Infrastructure. The organization is delivering several critical Projects across the country and is powered by a highly experienced workforce. It has the ability to bid, execute and implement medium and large-size projects across various infrastructure segments. SUMO is planning forays into new sectors while strengthening existing sector activities and investing heavily in infrastructure to have a niche in the industry. Presently, Sumo construction is constructing four Hydropower projects with a total capacity of 320 MW in Nepal at a total cost of NPR 53,000 million (NPR 53 billion), equivalent to USD 450 million. Their Projects, Likhu – ‘A’ HEP is completed and commissioned in FY 2021-22, whereas, the Likhu – 1 HEP and the Likhu – 2 HEP are expected to be operational in FY 2022-23. SUMO Construction & Engineering (P) Limited has emerged as a leading construction solution provider in the changing Construction Industry of Nepal. It is developing four Hydropower Projects along with Dams, Ancillaries like Sheds, Warehouses, and Hydropower colonies which are in various stages of construction supporting our nation’s power generation capabilities.

SUMO Construction & Engineering Pvt. Ltd.

Sumo has constructed more than 110 kms of rural roads and six bridges. It is also constructing a 21 km access road in the toughest terrain just next to China border which also includes a 1074- meter-long traffic tunnel.

Tunnels

The company has completed a tunneling job combining a total length of approx. 19.8 km. We have achieved an average progress of 4.4 meters per day continuously while excavating 2.4 kms of (HRT) Head Race Tunnel of Likhu – ‘A’ Hydropower which has been the highest till date in Nepal. The company has completed three inclined pressure shafts. The longest inclined pressure shaft in Nepal having a length 470 m was completed in the Likhu 1 HEP.

CONSTRUCTION OF SWITCH YARD

Sumo Construction & Engineering (P) Ltd has been awarded the Civil Works of three hydropower projects which also includes the construction of switch yard civil foundations for all the three projects. There is a common pooling hub for all three hydro projects at Likhu – ‘A’ HEP.
The pooling hub will be connected to New Khimti substation which is connected to the national grid. Each switchyard is designed for 132 KV with an impulse voltage level of 650 KV and a frequency voltage of 275 KV. The switch yard construction of Likhu A and Likhu 2 is completed.

CONSTRUCTION OF TRANSMISSION LINE

Sumo has constructed more than 110 kms of rural roads and six bridges. It is also constructing a 21 km access road in the toughest terrain just next to China border which also includes a 1074- meter-long traffic tunnel.

Likhu 1 to Likhu 2

The total length of Likhu 1 to Likhu 2 is about 7 km. It is a 132 kV single circuit transmission line and 18 towers are under construction.

Likhu 2 to Likhu A

The transmission line from Likhu 2 to Likhu A is a common line of Likhu 1 and Likhu 2 projects. The total length of Likhu 2 to Likhu A is about 5 km. It is a 132 kV double circuit transmission line and 15 towers are under construction.

Likhu A to New Khimti

The transmission line from Likhu A to New Khimti is a common line of all three projects. The total length of Likhu A to New Khimti line is about 29 km. It is a 132 kV double circuit transmission line with 78 nos. The erection and stringing of all 78 nos. towers are completed.

OUR GROWTH PATH

Sumo construction has grown very rapidly in the last few years achieving an astounding growth rate year on year basis. The total turnover of the sumo construction from 2075-76 to 2078-79 is more than 1100 crores. 