Nasa Hydropower Pvt Ltd

General Information

Project name Lapche Khola Hydropower Project (LKHP)
Latitudes 27°58’00” N and 28°07'29”E
Longitudes 86°10'37” N and 86°13'40”E
Rural Municipality Bigu Rural Municipality-1,Lamabagar
District Dolakha
Province 3

Access Road

Kathmandu to Charikot 130 km Black top
Charikot to Singati 38 km Black Road
Singati to Lamabagar 28 Km Gravel Road
Lamabagar to Powerhouse 10 Km Need to Construct
Powerhouse to Dam site 8 km Need to Construct

Type of power plant

Type Peaking Run-of-river (PRoR)

Hydrology

Catchments area at intake site 590 km²
Design Flow Discharge at Q40% 22.53 m³/s
Average minimum flow 4.39 m³/s
Environmental Flow 0.439 m³/s
Average annual rainfall 600.0 mm
Average annual runoff 20.24 m3/s
Flood Q500 1009.0 m3/s
Flood Q1000 1093.0 m3/s
Flood Q10000 1372.0 m3/s
GLOF 2500.0 m3/s

 

Type  Outdoor

Energy Generation